Bar Cutting Machine Checklist








           

                BAR CUTTING MACHINE CHECKLIST    

  REV NO.    

  DATE    

  PAGE  


NAME OF PROJECT:-______________________________________________________ 

NO:-_______

NAME OF CONTRACTOR/SUB CONTRACTOR:-_____________________________________________

IDENTIFICATION NO./SR.NO:-__________________________________________________________

 

SR.NO. PARTICULAR OK NOT OK NA REMARKS    

1. Machine erected ina a firm base concrete platform.    

2. Machine is grouted properly/ Base wheel stopper provided.    

3. Body earthing is provided.    

4. D.B box connected with the machine is equipped with MCB and ELCB.    

5. Emergency switch is avialable in workin condition (Front side and back side of the M/c).    

6. Last date of Equipment Servicing/Inspection.    

7. Power on & off switch with indicator light are available in working condition.    

8. Belt and other ineternal moving parts are covered/Guarded.    

9. No oil leakage.    

10. No any abnormal noise from Electrical Motor.

   

11. No any abnormal noise from Electrical Motor.    

12. No play between operting Leaver.    

13. Bar Cutting & Operator area is free of Obstacles.    

14. Last maintenance date.  


Overall Remark, if any:-  _____________________________________________________________

Name & Sign of Safety officer:- _______________________________________________________

Name & Sign of Project Manager:-______________________________________________________


Comments

  1. Amazing Writeup! This is definitely the perfect article. You make this information interesting & engaging. You deliver readers hundreds to mirror on and I recognize that form of writing. This is easy, but the remarkable article I simply have ever seen. I like it. Find the Best Bar Cutting Machine Supplier in Sharjah.

    ReplyDelete

Post a Comment

Popular posts from this blog

Bar bending machine Checklist